Scorecard: Krawl — http¶
Status: Informative · evaluation proof (not an endorsement)
UHBS: 4.2.2 · Class: Web-API · Protocol / surface: http
Target id (lab): Krawl-http · Evaluation date: 2026-07-29
| Run | UHQS | Grade | δ_C | Proof artifacts |
|---|---|---|---|---|
| Quick | 50.91 | D | 0.5625 | See report hub quick artifacts |
| Full (authoritative) | 50.91 | D | 0.5625 | Verbatim SCORECARD below + report.json on the report hub |
Report hub: Krawl / http · Tutorial · Methodology
How to read UHQS: CTI / blue-team guide
Proof: module scores (full run)¶
| Module | Score | Weight | Status | Notes |
|---|---|---|---|---|
| Module A: Protocol Fidelity | 100.0 | 0.25 | PASSED | fsm=100 nego=100 timing=100 |
| Module B: Behavioral Realism | 82.5 | 0.20 | PASSED | survived binary blast |
| Module C: Telemetry Quality | 100.0 | 0.20 | PASSED | telemetry_dir missing — set TPS/inventory telemetry_dir for C1 schema gates |
| Module D: Safety & Containment (C) | 75.0 | GATE | PASSED | UHBS_AIRGAP_ATTESTED=1 (operator attestation; not a substitute for shell probes on SSH decoys) |
| Module E: Scalability & Latency | 100.0 | 0.15 | PASSED | service alive after load (connect 0.2ms) |
| Module F: Static Code Audit | 70.0 | 0.20 | PASSED | POSIX coverage 0% (0/104) |
| Safety Gate δ_C | 0.5625 | GATE | — | Containment multiplier |
How CTI / blue team should read this¶
- Prefer the full SCORECARD over quick for operational decisions.
- Check δ_C carefully — values below 1.0 mean the Safety Gate reduced composite UHQS.
- Module C is harness visibility, not your SIEM pipeline; wire log shipping yourself.
- See READING-UHQS.md for module A–F interpretation.
- Do not cite UHQS without the verbatim SCORECARD or
report.json.
Verbatim full SCORECARD¶
====================================================================================
UNIVERSAL HONEYPOT BENCHMARK SCORECARD v4.2.2
====================================================================================
Target System : Krawl-http
System Profile Class : Web-API
Protocols : http
Evaluation Date : 2026-07-29
Evaluation Type : Full-Spectrum (Static Audit + Dynamic Sandbox)
Environment : Isolated Sandbox
MCP Surface Depth : unknown
------------------------------------------------------------------------------------
EVALUATION MODULE SCORE (0-100) WEIGHT STATUS
------------------------------------------------------------------------------------
Module A: Protocol Fidelity : 100.0/100 0.25 PASSED (fsm=100 nego=100 timing=100)
Module B: Behavioral Realism : 82.5/100 0.20 PASSED (survived binary blast)
Module C: Telemetry Quality : 100.0/100 0.20 PASSED (telemetry_dir missing — set TPS/inventory telemetry_dir for C1 schema gates)
Module D: Safety & Containment (C) : 75.0/100 GATE PASSED (UHBS_AIRGAP_ATTESTED=1 (operator attestation; not a substitute for shell probes on SSH decoys))
Module E: Scalability & Latency : 100.0/100 0.15 PASSED (service alive after load (connect 0.2ms))
Module F: Static Code Audit : 70.0/100 0.20 PASSED (POSIX coverage 0% (0/104))
------------------------------------------------------------------------------------
SAFETY GATE MULTIPLIER : δ_C = 0.5625 (C = 75.0 < 95 — exponential penalty)
FINAL COMPOSITE SCORE (UHQS 4.2.2) : 50.91 / 100
OVERALL EVALUATION GRADE : GRADE D (Needs Remediation)
====================================================================================
Replication¶
Re-run commands are in the tutorial. Environment and limitations are in the methodology.
Product names appear only under conformance as evaluation proof — not UHBS requirements.